Auditorium Door Respray - The Student Hotel, Merchant City
Explore Project

Spray Finishes & Resurfacing
SERVICE
Sliding auditorium doors
SURFACE
Hospitality / Hotel
SECTOR
1 day
DURATION
Overview
Process
As the work was carried out in a live hotel environment, careful planning was required to manage fumes, overspray, and guest movement. The area was fully tented off and an extraction system installed to control airflow and ensure safe working conditions. The doors were then professionally prepared and resprayed to achieve a consistent, durable finish.

Results
The respray restored the sliding doors to a clean, uniform appearance, extending their lifespan without the need for removal or replacement. The work was completed with minimal disruption to hotel guests and staff, allowing the space to remain operational throughout the process.




